Banner Default Image
Blank

Inland Rail - Beveridge to Albury Tranche 2

Client: John Holland

Location: Victoria & New South Wales

Value: $450m

This project is part of the broader Inland Rail initiative, which aims to upgrade the rail network in Victoria to facilitate the transport of double-stacked freight trains. The project is expected to be completed in 2027.

Blank

Melbourne Metro Tunnel

Client: Rail Infrastructure Alliance (John Holland, CPB Contractors, AECOM)

Location: South Yarra & Kensington, VIC

Value: $1.6b

Connect People is excited to be a supplier to Rail Infrastructure Alliance (RIA), the last major contract awarded as part of the Metro Tunnel project. The RIA consortium comprises John Holland, CPB Contractors and AECOM, and is responsible for delivering the tunnel entrances in South Yarra and Kensington. Connect People is proud to be involved with the project.

The Metro Tunnel project will free up space in the existing City Loop, allowing more trains to run to and from the suburbs and taking Melbourne’s busiest train lines through a new tunnel under the city.

It is anticipated that the RIA package will create more than 1,000 jobs, and is expected to be completed in 2025.

Watch video

Image 2026 01 29 T01 57 13

SPAPC River Zone

Client: Fulton Hogan

Location: Sydney, VIC

Value: $786m

The Parklands zone covers the western corridor of Greater Sydney and consists of more than 2,100 lane km of road, 166 bridges, 1 tunnel, 432 km of cycleway, 344 km of roadside safety barriers, 34,149 traffic signs and 879 traffic signals. The contract also includes the management of ITS across the Parklands zone and Regional NSW, consisting of 4,828 streetlights and 4,080 other assets.

Image 2026 01 29 T02 07 10

Pyrmont Bridge

Client: Marine & Civil Maintenance

Location: Darling Harbour, NSW

Value: $82m

Located in Sydney’s Darling Harbour, Pyrmont Bridge, which opened in 1902, is one of the oldest surviving electrically operated swing span bridges in the world and is recognised as a National Engineering Landmark. More than 6 million pedestrians and cyclists use the bridge, while 600 vessels pass through its swing spans annually.

To be carried out in multiple stages over the next five years, the $82 million restoration project will ensure the bridge remains an active city landmark. To maintain the ongoing structural integrity of the bridge, the deteriorated timber sections within the bridge pier and truss sections will be replaced in the first stage of the remediation project.

Image 2026 01 29 T02 07 10

Gold Coast Infrastructure Solutions

Client: Downer Ventia Joint VentureDowner Ventia Joint Venture

Location: City of Gold Coast, QLD

Value: $250m

Gold Coast Infrastructure Solutions (GCIS) is a 50:50 joint venture between Downer and Ventia, established under a 10-year contract to provide comprehensive asset lifecycle delivery services for the City of Gold Coast’s water and sewerage networks.

This partnership is responsible for the delivery of essential water supply and sewerage services across the City of Gold Coast.

Image 2026 01 29 T02 07 10

M2 / Lane Cove Tunnel Motorway

Client: Ventia

Location: Sydney, NSW

Value: $400m

Ventia will provide incident response and maintenance services for the 3.6km Lane Cove Tunnel and 21km Hills M2 Motorway, which connect Sydney’s lower north shore and northwest regions.

Under the contracts, Ventia will provide Transurban with a new, tailored service delivery model that builds upon the confidence Ventia already inspires maintaining Transurban’s Eastern Distributor (ED) and Cross City Tunnel (CCT) assets.


A crucial element that helped shape the unique network approach is Ventia’s ability to leverage operational efficiencies drawing on existing experience rom its other Sydney-based transport contracts.

Blank

Monash Freeway Upgrade - Stage 2

Client: CPB Contractors

Location: Monash and Princes Freeways

Value: $800m

Monash Stage 2 Construction commenced in early 2020 and is expected be completed in 2022. For Stage 2, the project will:

• Add 36 kilometres of new lanes on the Monash and Princes Freeways
• Connect Police Road to the freeway and connect Jacksons Road outbound ramps
• Install smart, on-road technology across the project, including the lane-use management system from the South Gippsland Freeway
• Upgrade O’Shea Road to three lanes in each direction between Clyde Road and Soldiers Road, and extend O’Shea Road to join the Beaconsfield interchange, as well as adding an inbound freeway off-ramp and an outbound freeway on-ramp
• Build a shared walking and cycling path along O’Shea Road between Clyde Road, Berwick and the Princes Highway, Beaconsfield.

Watch video

Image 2025 09 30 T02 52 15

NBN Construction Contract

Client: Ventia

Location: New South Wales, Victoria, Queensland

Value: $1.1b

The combined portfolio of contracts cover design and construction to support NBN Co’s network investment plan to make its highest wholesale speed plans available, on demand, to up to 75 per cent of households and businesses on the fixed line network.

NBN Co’s selection criteria for its upgrade program is based on areas where the company anticipates strong demand for higher speeds; where it can provide maximum benefit to the most customers; where it can deploy with speed and agility; and where its investment will have the greatest economic benefit.

Wastewater Treatment Plant Upgrade

Client: NSW State Government

Location: Vineyard, NSW

Value: $130m

The New South Wales Government will invest to expand and upgrade wastewater and water treatment services in the North West Priority Growth Centre.

The Riverstone Wastewater Treatment Plant at Vineyard is being expanded and upgraded to service the estimated more than 25,000 new dwellings.

As well as this, the Rouse Hill and Castle Hill Water Recycling Plans (WRP) are being expanded to service 3,600 new dwellings.

Image 2026 01 29 T02 07 10

Level Crossing Removals

Client: John Holland, KBR, VicRoads, Public Transport Victoria (PTV) and Metro Trains Melbourne (Metro)

Location: Burke, North, McKinnon & Centre Roads, Melbourne

Value: $530m

The project consists the removal of the level crossings at Burke, North, McKinnon & Centre Roads to reduce congestion in the area and create a safer, more connected community.

Image: Major Transport Infrastructure Authority

Image 2026 01 29 T02 07 10

Mordialloc Bypass Upgrade

Client: McConnell Dowell Decmil JV

Location: Mordialloc

Value: $350m

The Mordialloc Freeway will improve travel times and ease congestion in Melbourne’s south east, providing safer, more reliable journeys. As part of the Mordialloc Freeway project, we’ll build:

•Bridges over Springvale, Governor, Lower Dandenong and Centre Dandenong Roads, along with new freeway entry and exit ramps
•Bridges over Old Dandenong Road and the Waterways wetlands
•New entry and exit ramps at Thames Promenadean intersection with traffic lights at Wells Road and Thames Promenade
•An intersection with traffic lights to connect the Freeway with the Dingley Bypass
•A new shared walking and cycling path along the entire Freeway.

Bg Default Image

Find a Connect People recruitment partner near you

Our experts are helping build the Australia of tomorrow right across the east coast, with offices in Sydney, Melbourne, Brisbane and Adelaide.

Connect with our contract recruitment experts today to take the next step.